Ahead of a planned cable repair off Scotland’s northern coast, BT commissioned ABPmer to deliver a bespoke metocean study to provide comparable workability statistics for a number of potential approaches, and other supporting information.
Our study was informed by:
We undertook the study for three potential repair approaches, each with different weather limits: diver restricted operations, and the use of a cable installation buoyancy system under optimal and maximum workable conditions.
Our study delivered the following for each of the three approaches:
The results of the study helped guide BT’s investment in a cable floatation system, and successfully complete the repair operation with the new system, overcoming challenging weather conditions where divers would not have been able to work.
ABPmer supports marine infrastructure design with comprehensive metocean information to minimise uncertainty, maximise efficiency and ensure compliance with international standards. Find out more about our design criteria services.